D-GEO are exhibiting at Hillhead 2022
Quarrying + Construction + Recycling
Come and visit us!
D-GEO Ltd
Welcome to Derbyshire Geotechnical Ltd
Established from firm foundations and a wealth of experience in 2017, Derbyshire Geotechnical Ltd is one of the fastest growing Geotechnical Rope Access Operators in the UK, pursuing our commitment of ‘working at heights whilst striving for excellence.
Based in the heart of the Peak District, Derbyshire Geotechnical is a limited company offering a wide range of geotechnical services and experience within the Rope Access Industry. Our mission is to provide a safe, reliable, and professional service to all our clients in the UK and Beyond.
As a small and friendly company, we can offer a cost effective and personal service to all
our clients, this enables us to develop long term and trusting business relationships. We are proud to say our clients include: AMCO Rail, Bam Nuttall, Breedon Aggregates, Hanson UK, Keller Geotechnique, Tarmac, among many others.
Our Services
De-Vegetation
- Removal of light vegetation and scrub from slopes and structures.
- Large and difficult tree removal and felling.
- Removal and treatment of invasive species (Eg Knot weed and Himalayan Balsam etc)
- Herbicide treatment and Eco-Plugging.
Slope stabilisation
- Soil Nailing
- Facing Systems
- Slope drainage
- Installation of Erosion Matting.
Rock Face Stabilisation
- Rock scaling and re profiling.
- Dentition work.
- Rock bolting and dowels.
- Rock Anchoring.
- Installation of rockfall mesh.
- Sprayed Concrete.
Rock Fall Containment
- Catch fences.
- Rock fall netting and meshing
Structural Repairs
- Concrete Repairs
- Brickwork and Masonry Repairs
- Tie bars and Ground Anchors
- Retaining walls
- Re-construction and renovation to stonework and stone arching (Heritage Work)
Facing Systems
- Encourage vegetation growth
- Considerably enhances stability of soil slope through soil retention
Recent works undertaken by Derbyshire Geotechnical Ltd
Criggion Quarry – Eastern Faces – Rockfall mesh and off-set cabling to allow re-planting on benches installed by Derbyshire Geotechnical
Alderley Edge Bridge – Debris Netting Repaired and re-installed by Derbyshire Geotechnical Ltd under viaduct – January 2018
90m long GBE-500A Geobrugg Catch Fence installed by Derbyshire Geotechnical Ltd at Gore Quarry – March 2018
Derbyshire Geotechnical Ltd Operative installing Greenax (Combined erosion matting and rockfall mesh) at Cloud Hill Quarry – April 2018
Llechwedd Slate Mine, North Wales – Anchors, Cable and TECCO Mesh installed by Derbyshire Geotechnical Ltd to secure face above public access route into slate mine – April 2018
Derbyshire Geotechnical Ltd Operative installing rockfall mesh to secure faces above working areas at Cloud Hill Quarry – April 2018
Ecton Mine Adit – Section of Adit Arching – Renovated and re-built by Derbyshire Geotechnical Ltd – November 2018
Lithalun Quarry – Rockfall Mesh and Cables Installed by Derbyshire Geotechnical Ltd to secure face above new plant – November 2018
Matlock – Rockfall Mesh to protect property installed by Derbyshire Geotechnical Ltd – September 2018
Scout Road – Soil Nails installed by Derbyshire Geotechnical Ltd to secure King Post Wall – September 2018
Scout Road, Mytholmroyd – Soil nails, mesh and erosion matting installed by Derbyshire Geotechnical Ltd to secure slope behind property – April 2018
Criggion Quarry – Anchors and mesh securing face – June 2018
Dowlow Quarry – Face with new mid-cable installed and mesh repaired – Dec 2018
Kinver – Dentition Work underway at Rock Houses – November 2018
Mountsorrell Quarry – Anchors and mesh securing face adjacent to haul road – April 2019
Mytholmroyd – Soil Nails installed to retain Kingpost Wall finished work – September 2018
Previous work undertaken by Derbyshire Geotechnical Ltd
Deltax Mesh, secured by Soil Nails, installed by D-Geo at Dowlow Quarry – Nov 2017
Dinorwic Catch Fence 2017
Stancombe Quarry, Rockfall mesh, August 2017
Derbyshire Geotechnical Ltd Operatives undertaking de-Scaling operations in preparation for rock mesh installation at Cloud Hill Quarry – September 2017