Castle Walk, Bridgnorth
A technically challenging public-facing slope stabilisation scheme delivered safely, on time and within budget.

Protecting a sensitive public location
Castle Walk presented a steep slope above public walkways and neighbouring properties. Restricted access, ongoing public use and the visual character of the site demanded a robust engineered solution with minimal disruption.
D-GEO stabilised the slope, reinforced the existing retaining wall and reinstated vegetation to create a durable and visually sympathetic finish.
Complex access and public safety
- Steep slope above public routes
- Restricted drilling and material access
- Existing retaining wall requiring reinforcement
- Nearby businesses and properties
Engineered stability with a sensitive finish
IRATA rope access and lightweight drilling reduced the need for heavy plant. Works combined de-vegetation, testing, soil nailing, reinforced mesh and carefully planned vegetation reinstatement.
- Controlled work zones maintained public safety
- Testing verified the designed anchor system
- Low-maintenance erosion control supported regrowth
How the project was delivered
Site establishment
Secure access, compound and exclusion zones.
Slope preparation
Controlled de-vegetation and debris management.
Testing and drilling
Suitability testing and lightweight drilling.
Soil nailing
Installation to the engineered layout.
Mesh installation
Reinforced stability and erosion control.
Reinstatement
Planting, inspections and clean handover.
Safer, stable and sympathetically restored
The scheme improved long-term slope stability and public safety while maintaining access and limiting disruption. Engineered reinforcement was integrated with low-maintenance vegetation to preserve the character of Castle Walk.