Explore selected D-GEO projects across rail, quarries, civil engineering, heritage and difficult-access sites throughout the UK.
Each case study shows the site constraints, technical approach and outcome.
Vegetation clearance across three rail-side embankment areas, delivered during controlled possessions with no disruption to the railway.
A two-phase stabilisation scheme above a primary crusher, delivered safely in an active quarry without interrupting operations.
Emergency stabilisation of a historic quarry face below residential gardens, using suspended rope-access drilling.
Difficult-access mine ground-support works combining rope access, anchoring and mesh installation.
Careful rock stabilisation works in a sensitive, high-footfall landscape beside Aira Force waterfall.
Slope stabilisation and difficult-access works protecting a public route and adjacent infrastructure.
Tell D-GEO about the site, scope and access requirements.